Abstract
This paper presents a scheduling algorithm applied to a circular manufacture assembly with redundant facilities. The task is to switch on and off facilities in a manner that minimizes job failure cost and job flow time for a given job production order. The dynamic nature of the scheduling problem is dictated by the aging of the facilities. An example is given to show how our scheduling algorithm results in different system reliability, failure cost and job flow time under differently weighed cost functionals.
| Original language | English |
|---|---|
| Pages (from-to) | 1005-1009 |
| Number of pages | 5 |
| Journal | IFAC-PapersOnLine |
| Volume | 36 |
| Issue number | 5 |
| DOIs | |
| State | Published - 2003 |
| Event | 5th IFAC Symposium on Fault Detection, Supervision and Safety of Technical Processes, Safeprocess 2003 - Washington, United States Duration: Jun 9 1997 → Jun 11 1997 |
Keywords
- Dynamic programming
- Failure cost
- Flow time
- Reliability
- Scheduling
Fingerprint
Dive into the research topics of 'Dynamic scheduling for minimal flow time and maximum reliability'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver