Skip to main navigation Skip to search Skip to main content

Estimation of costs of technical and allocative inefficiency

  • Montelllier Business School
  • Lancaster University

Research output: Contribution to journal › Article › peer-review

5 Scopus citations

Abstract

If a firm is both technically and allocatively inefficient its cost will increase. Since allocative inefficiency results from misallocation of inputs, cost of allocative inefficiency (CAI) can be obtained if the input over(under) use can be analytically derived. This is only possible for production functions for which input demand functions can be explicitly derived. Schmidt and Lovell (1979) addressed this problem using a Cobb-Douglas production function with the cost minimizing behavior. In this paper, we propose a mixture of Cobb-Douglas (CD) production functions to get a more flexible system that allows obtaining costs of technical and allocative inefficiency analytically. Inflexibility of the CD function is addressed by making its parameters (input elasticities) functions of environmental/predetermined variables. Our empirical evidence show considerable heterogeneity in parameters and multimodal distributions of many quantities of interest, which support our formulation.

Original languageEnglish
Pages (from-to)41-46
Number of pages6
JournalJournal of Productivity Analysis
Volume55
Issue number1
DOIs
StatePublished - Feb 2021

Keywords

  • Allocative inefficiency
  • C10
  • C30
  • D21
  • D22
  • Flexible functional forms
  • Primal system
  • Technical inefficiency

Fingerprint

Dive into the research topics of 'Estimation of costs of technical and allocative inefficiency'. Together they form a unique fingerprint.

Cite this