Abstract
Why does a large institution build in a flood-prone area and how does it respond when flooding causes great damage? This is a case study of a major flood event-the 2008 Iowa-Cedar River flood-and the University of Iowa, whose recovery is expected to cost about US$750 million. The case explores the factors that led a major institution to invest so much of its infrastructure into a flood-prone river shed and then describes and evaluates the decision-making process the University has undertaken with the goal of becoming a more sustainable and resilient campus.
| Original language | English |
|---|---|
| Pages (from-to) | 50-73 |
| Number of pages | 24 |
| Journal | Journal of Planning History |
| Volume | 16 |
| Issue number | 1 |
| DOIs | |
| State | Published - Feb 1 2017 |
Keywords
- City beautiful
- Ecological planning
- Infrastructure
- Master plans
- Places
- Planning eras/approaches
- Planning practice
- Waterfronts
Fingerprint
Dive into the research topics of 'Planning for floods at the University of Iowa: A challenge for resilience and sustainability'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver